Fort Custer Trail Day #7

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

Fort Custer Trail Day #6

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

Fort Custer Trail Day #5

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

Fort Custer Trail Day #4 (National Trail Day)

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

2018 Fort Custer Stampede

Fort Custer Stampede

Don’t miss the Fort Custer Stampede on Sunday, May 6th, 2018! This mountain bike race is a Southwest Michigan Mountain Bike Association event. Proceeds assist SWMMBA in building and maintain trails in southwest Michigan.

More info and tickets available here: https://www.bikereg.com/24th-fort-custer-stampede-swmmba

Fort Custer Trail Day #3

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

Fort Custer Trail Day #2

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.

Fort Custer Trail Day #1

Meet-up location and specific work detail for each date TBD.

Major projects will include:
Red Trail between intersections 6, and 7 and 16 and 17 (Crazy Beaver) for necessary improvements/reconfiguration to the fall line switchbacks to eliminate erosion issues and sand pits at lowest elevation points.
Green Trail between intersections 5 and 6 for revision to boardwalk/planking in the Gullies area to optimize bi-directional flow and necessary reroutes to reduce/eliminate sand pit formation, e.g. between Switchback and Gullies areas.